Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 20 results ...

Adjei, K O (2020) A model for predicting cost control practice in the Ghanaian construction industry, Unpublished PhD Thesis, , University of Johannesburg.

Agumba, J N (2013) A construction health and safety performance improvement model for South African small and medium enterprises, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Ansah, S K (2018) An integrated total quality management model for the Ghanaian construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Coffie, G H (2018) Development of a cost-predicting model for construction projects in Ghana, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana, Unpublished PhD Thesis, , University of Johannesburg.

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process, Unpublished PhD Thesis, , University of Johannesburg.

Ladzani, M W (2009) Evaluation of small and medium-sized enterprises' performance in the built environment, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Makabate, C T (2021) Investigating the adoption of building information modelling (BIM) within the small medium enterprises (SMEs) in contracting and consulting organisatios in the South African construction industry, Unpublished PhD Thesis, , University of Johannesburg.

Marnewick, C (2008) Ensuring succesful erp implementations using the vision-to-project framework, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Marxen, K (2017) Demand guarantees in the construction industry: A comparative legal study of their use and abuse from a South African, English and German perspective, Unpublished PhD Thesis, , University of Johannesburg.

Musonda, I (2012) Construction health and safety (H&S) performance improvement: a client-centred model, Unpublished PhD Thesis, , University of Johannesburg.

Mwanaumo, E M (2013) An integrated approach to multi-stakeholder interventions in construction health and safety, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry, Unpublished PhD Thesis, , University of Johannesburg.

Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality, Unpublished PhD Thesis, , University of Johannesburg.

Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Ojo, E M (2016) Assessment of green supply-chain management in South African and Nigerian construction firms, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Shikweni, S (2018) Talent management in the South African construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Somiah, M K (2018) An integrated competitive advantage model for indigenous construction firms in the Ghanaian construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Yankah, J E (2018) An integrated framework of marketing in construction contracting enterprises in the Ghanaian construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Zaayman, L (2017) Optimisation of mechanised maintenance management of railway track infrastructure, Unpublished PhD Thesis, , University of Johannesburg.

  • Type: Thesis
  • Keywords: optimisation; railway; railway track; traffic; lifecycle; maintenance management; renewal; selection criteria
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2526871942
  • Abstract:
    Railway track infrastructure is a complex system consisting of various subsystems which require incremental maintenance from all engineering disciplines; all of whom are competing for the limited time and number of available maintenance windows.The constant demand for higher traffic volumes, increased train speeds and heavier axle loadings all result in an exponential increase in maintenance requirements but the time available for maintenance is as a result even further reduced. This requires a more scientific lifecycle approach to infrastructure maintenance management. It also requires increased performance from mechanised construction, maintenance and renewal machines to keep the infrastructure reliable, available, maintainable, affordable and safe within the short windows. The objectives of this thesis are to address the optimisation of infrastructure maintenance management and to provide a model with selection criteria for maintenance machinery and their features for the prevailing circumstances.